Gas Turbine Control and Monitoring

TEC has 10 years experience in the supply of control and monitoring solutions for many types of gas turbines. We have carried out control system retrofit work on industrial packages in simple and combined cycle configuration. We specialize in the following types:

1) Rolls Royce Avon, Olympus and RB211
2) GE LM2500, LM5000 and LM1600
3) GE Frame 3, 5, 6 , 7 and 9
4) Ruston TA, TB, TD, Tornado and Typhoon
5) Pratt & Whitney FT4
6) Solar Centaur and Mars
7) GEC EM85 and EM610

Turbine Energy Co, offer:

The TS7 series of turbine control systems were designed specifically for the retrofit of heavy duty gas turbine controls; in particular, the Speedtronic and LA families of turbine controllers.

It is a competitive alternative solution for the replacement of older control technology. The turbine control philosophy of the original system is maintained and it is easily adapted to site-specific requirements.

System Feature

  • PLC system architecture
  • Hot backup PLC redundancy
  • Fuel governor
  • Auto synchronisation & power monitor
  • Gas turbine protection
  • Automatic start-up, auxiliaries sequencing
  • Combustion monitor

User Benefits

  • Minimize GT downtime
  • Increase availability and reliability
  • Readily available spares-worldwide support
  • SCADA interface, all parameters visible to operator
  • Ease of maintenance/set up
  • Networking capability
  • Easy access and export of GT data
  • Non-dependence on OEM spares (Speedtronic cards)
  • Buy-back of existing control systems option (e.g. Mk I – Mk IV)